BOPU

AcronymDefinition
BOPUBoard of Public Utilities (Cheyenne, WY)
References in periodicals archive ?
The interior and exterior of the new, larger facility was designed for BOPU by Short Elliott Hendrickson, Inc.
These features provide the BOPU with a more effective work environment with reduced energy costs.
SEH began design work on the BOPU building in March 2008.
proposals and to accept the proposal it concludes is in the best interest of the BOPU.
The BOPU s 2013 Water and Wastewater Master Plans, Volume 4 -Potable Water Treatment,
Development of a list of fire risk monitoring tools and how BOPU might include those
Meet with BOPU staff to discuss the surveying scope, foreseeable issues, possible alternatives, and desired results.