CAT III

AcronymDefinition
CAT IIIInstrument Landing Category III Flight Conditions (700 foot visible range at ground level)
References in periodicals archive ?
Officials of the European public-private partnership SESAR (Single European Sky ATM Research) programme said the programme took a step toward the objective of optimising runway capacity under low visibility conditions last week at Frankfurt Airport when a prototype NORMARC 8100 CAT III ground based augmentation system went into operation.
The label of "Cat-II tracing" is given to all FHR patterns that cannot be assigned to Cat I or Cat III.
This led to implementation of low visibility procedures (LVP) at the new runway around 10 PM and flights operated using CAT III instrument landing system while on the other CAT I was used.
These approaches will eventually be the Cat II and Cat III approaches of GPS.
The company offers three phase power quality analyzers that are rated to CAT III, 1000 V / CAT IV, 600V to quickly diagnose problems and build benchmarks for predictive maintenance.
The new terminal-studded with 78 aero bridges, 97 automatic travelators and latest Cat III runway landing systems-will more than double the airport's current capacity and handle nearly 35 million passengers a year - posing a serious challenge to Hong Kong, Singapore and Dubai as a regional transport hub.
Fluke insulation testers can now conduct the entire range of test voltages specified in IEEE 43-2000 with a best in class, three year warranty and CAT III, 1000 V, CAT IV 600 V safety rating.
The newly operational second runway is planned to be CAT III B approach rated this year putting the airport up among a select number of airports in the world.
Etihad took delivery of its first narrow body aircraft in April 2008 and has worked closely with the GCAA since then to gain the CAT III B approval.
Because of the aircraft spot, the CAT III crane in the hangar could not reach it.
The tractors incorporate a new AutoPowr[TM] infinitely-variable transmission, reduced sound levels, convertible CAT IV NL / CAT III rear 3-pt hitch Quick Coupler, and a CAN-based Solid State Electrical Load Center.
The electrician's combo kit includes a 112 true-rms DDM and 322 clamp meter with one-handed controls, and both tools are rated to meet IEC 1010-1 CAT III 600 V safety standards.