Printer Friendly
The Free Dictionary
982,750,045 visitors served.
?
Dictionary/
thesaurus
Medical
dictionary
Legal
dictionary
Financial
dictionary
Acronyms
 
Idioms
Encyclopedia
Wikipedia
encyclopedia
?

iDC
(redirected from Interest during construction)

   Also found in: Financial 0.31 sec.
AcronymDefinition
IDCI Don't Care
IDCInternational Data Corporation
IDCInternet Database Connector
IDCIdentification Code
IDCIdentity of Key Distribution Center (FIPS)
IDCImage Dissector Camera
IDCImperial Defense College
IDCImplementation Strategies for Knowledge Management in Banking
IDCIn Due Course
IDCIn Dwelling Catheter
IDCIn-Transit Data Card
IDCIndefinite Delivery Contract (ongoing project)
IDCIndependent Duty Corpsman (US Navy hospital corpsman with advanced training)
IDCIndex of Dispersion for Counts
IDCIndicator Dilution Curve
IDCIndirect Costs (commonly referred to as facilities and administrative costs)
IDCIndividual Defense Counsel
IDCIndustrial Development Corporation (Trinidad and Tobago)
IDCInfectious Diseases in Children (journal)
IDCInformation and Documentation Center (Royal Institute of Technology Library, Stockholm, Sweden)
IDCInformation Decision and Control
IDCInformation Design Change
IDCInformation Distribution Company
IDCInformation Dominance Center
IDCIngenieros de Construcción (Guatemala)
IDCInitial Defensive Capability
IDCInitial Design Concept (Sprint)
IDCInitial Distribution Cancellation
IDCInitiating Device Circuits
IDCInnovation Dynamics Consulting, Inc. (Matthews, NC)
IDCInput Data Correction
IDCInspection Data Code
IDCInstallation Design Criteria
IDCInstantaneous Deviation Control
IDCInstructional Delivery Continuum
IDCInstructor Development Course (SCUBA PADI course designed to train instructors)
IDCInsulation Displacement Connector/Connection
IDCInsulation Displacement Contact
IDCIntangible Drilling Costs
IDCIntegrated Demonstration Coordinator
IDCIntegrated Door Controller
IDCIntelligent Data Cleanup
IDCIntelligent Digital Crossconnect
IDCIntelligent Distribution Centre (industrial order picking)
IDCInter Discipline Check
IDCInter-Departmental Committee
IDCInter-Dial Clock (ICAS)
IDCInter-Digital Capacitor
IDCInteractive Datacom Configurator
IDCInteractive Display and Control
IDCInterconnected Duct System
IDCIntercostal Data Corporation
IDCInterdepartmental Communication (Memo)
IDCInterdepartmental Correspondence
IDCInterdigital Communications
IDCInterest During Construction
IDCInterior Designers of Canada
IDCInternal Drive Cable
IDCInternational Datacasting Corporation
IDCInternational Development Corporation
IDCInternational Diabetes Center
IDCInternational Digital Centre, Inc. (New York City, NY, USA)
IDCInternational Digital Communications, Incorporated
IDCInternational Dollar Card (American Express)
IDCInternational Driver's Challenge (auto racing)
IDCInternational Drycleaners Congress
IDCInternet Data Center
IDCInternet Data Communications
IDCInvoluntary Detrusor Contractions (bladder disorder)
IDCIris Deactivation Code (Stargate)
IDCIsleton Development Company, LLC (Isleton, California)
IDCItem Description Code
IDCId for a Control
IDCIdentifier for Cursor
IDCInformation Distribution Companies
IDCIntegrated Database Connector
IDCIntegrated Desktop Connector
IDCIntelligent Distribution Controls
IDCInter Device Communication
IDCInteractive Dynamics and Control
IDCInternational Data Communications
IDCInternational Digital Center
IDCInternet Data Connector
iDCImmature Dendritic Cells
iDCInformation Development Consultants, Inc.

?Page tools
Printer friendly
Cite / link
Email
Feedback
? References in periodicals archive
The Southern California Public Power Authority, a joint-powers agency of which the six cities are members, funded about $314 million worth of bonds over 30 years to construct the facility, pay for the interest during construction, operate and maintain it.
88% ownership interest in a new 750 mw super-critical pulverized coal-fired generating facility (Trimble County Unit 2) and interest during construction.
The cost of the new generating facility, including interest during construction, financing and legal expenses, and improvements to existing generating units at the site, is estimated at $925 million.
 
Acronyms browser? ? Full browser
 
 
Acronyms and Abbreviations
?

Disclaimer | Privacy policy | Feedback | Copyright © 2008 Farlex, Inc.
All content on this website, including dictionary, thesaurus, literature, geography, and other reference data is for informational purposes only. This information should not be considered complete, up to date, and is not intended to be used in place of a visit, consultation, or advice of a legal, medical, or any other professional. Terms of Use.