JFAST

AcronymDefinition
JFASTJoint Flow and Analysis System for Transportation (USTRANSCOM system)
JFASTJoint Feasibility Analysis System for Transportation
References in periodicals archive ?
JFAST is High Level Architecture-compliant and includes a TPFDD editor.
The input setup for JFAST is discussed in detail in McKinzie.
The final type of output is a Joint Planning and Execution System (35) B-8 TPFDD which contains the information required by JFAST, the model used for discussing comparative results in the next section.
These results are then compared to the results obtained by JFAST using the identical inputs used for ATS-SMMSP.
Passenger and Cargo Ston (in 1,000 Stons) Arrival Violations Passenger Cargo Stons Stons Total Stons JFAST SMMSP JFAST SMMSP JFAST SMMSP Stage 1 11,894 47 6 14 11,900 61 Stage 2 11,894 35 6 13 11,900 48 Stage 3 11,827 17 6 13 11,833 30