LOMRLetter Of Map Revision
References in periodicals archive ?
Even for simple revisions, the typical FEMA process for obtaining a LOMR can take from six months to two years.
1 The scope of work shall consist of providing right-of-way plans, plats with legal descriptions, all applicable environmental documents and studies, preparing and obtaining all necessary environmental permits that apply, and construction plans including shared use path design, hydraulic and hydrologic design, pedestrian bridge structure design (if needed), retaining wall design (if needed), permit sketches, flood plain analysis and preparation of LOMR for submission to FEMA(if needed), and coordination of utility relocation design (if needed).
CLOMR / LOMR applications or other FEMA floodplain submittals (Conditional Letter of Map Revision /