MEPR

AcronymDefinition
MEPRMaster of Engineering Practice (Australia)
MEPRMail Enabled Process Reengineering
MEPRMission Essential Performance Requirements
References in periodicals archive ?
Alternatively, MEPR can be constructed by listing the pairs (nodeid, timestamp) in ascending order by timestamps.
Contract award notice: Cleaning of intersections of power lines, maintained by ESO EAD, MEPR Kyustendil.
Contract award notice:The order includes testing of dielectric gloves, dielectric boots and galoshes, insulating rods from 6 to 35 kv, handles for mounting of portable earths from 6 to 400 kv, pointers of voltage from 6 to 400 kv, contacts, pointers of voltage from 6 to 400 Kv, contactless and insulating pliers for replacements of 20 kv fuses, located in the territory of the MEP Sofia District, MEPR Pernik and MEPR Kyustendil.
Tenders are invited for "Hire of construction machines and equipment with operator for controlling the gauge of power lines by removing ground masses" with 2 lots: Lot 1 - Hire of construction machines and equipment with operator for controlling the gauge of power lines by removing of earth masses in MEEP Pernik, Lot 2 - Hire of construction machines and equipment with operator for control of gauge of power lines by removing of earth masses in MEPR Kyustendil.
Contract notice: Repair walling administrative building MEPR Vratsa
Lot 2: Clean the openings of overhead 110kV "Morava" OHL 110kV "Shivachevo" and OHL 110kV "Zheravna" - MEPR Sliven.