PLTU

AcronymDefinition
PLTUPembangkit Listrik Tenaga Uap (Indonesian: Electric Steam Power Plant)
PLTUPusat Listrik Tenaga Uap (Indonesian: Central Steam Power; Bandung Institute of Technology Network)
PLTUPatrol Leader Training Unit (South African Scout Association)
References in periodicals archive ?
By September 2013, the power generating plants already built and have been operational under the first 10,000 MW crash program include PLTU Labuan (2x300 MW), PLTU Suralaya Units 8 (625 MW), PLTU Indramayu (3x330 MW), PLTU Lontar (3x315 MW), PLTU Rembang (2x315 MW), PLTU Paiton Units 9 (660 MW) and PLTU Pacitan (2x315 MW) in Java ; and PLTU Asam-Asam (2x65 MW), PLTU Barru (2x50 MW), PLTU Amurang (2x25 MW), PLTU Kendari (1x10 MW) and PLTU Tanjung Balai Karimun Units 2 (1x7 MW) outside Java including in Sumatra and Kalimantan.
Table 24: PT PLN Invests US $74m in PLTU 3 Bangka Belitung Phase 1 Coal Power Plant, Indonesia 54
Earlier, Bank Panin financed the construction of PLTU Embalut Phase 1 with a capacity of 2x25 MW and PLTU Embalut Phase 2 with a capacity of 1x60 MW located in Kutai Kertanegara, East Kalimantan.
UBP Perak Grati is based in the village of Wates, sub-district of Lekok Grati in the regency of Pasuruan with generating units including PLTU Perak in Surabaya and PLTGU Grati in Pasuruan with a total installed capacity of 864.
In 2012 the 4th units of PLTU of Tanjung Jati B in Jepara, Central Java was commissioned.
The four units of PLTU are part of the units under the first phase of fast track program launched by PLN.
In 2011, PII provided guarantee for a coal-fired power generating project called PLTU Jawa Tengah, in Central Java with a capacity of 2 x 1,000 megawatts built with an investment of Rp 30 trillion.
00 Sources : Energy and mineral resources ministry * Estimate by the ministry Table--3 List of domestic coal consumers, 2012 (Million Sectors Companies tons) % PLTU PT PLN (Persero) & 57.
The 17 projects include a US$ 3 billion coal-fired power plant, PLTU Jawa Tonga, in Central Java, Bastary Pandji Indra, the development and government-private cooperation development director at the agency said.
Completion of a number of power generating projects were delayed such as PLTU Labuan Units 2, PLTU Rembang (Units 1 and 2), and PLTU Indramayu Units 1.
It consists of Units of PLTU Perak in Surabaya and PLTGU Grati in Pasuruan located 90 kilometers apart with total installed capacity of 864.
He said that the construction will start in 2015 and was expected to be completed in five years for PLTUs and in about seven years for PLTAs.