Printer Friendly
The Free Dictionary
1,155,944,348 visitors served.
?
Dictionary/
thesaurus
Medical
dictionary
Legal
dictionary
Financial
dictionary
Acronyms
 
Idioms
Encyclopedia
Wikipedia
encyclopedia
?

PCE
(redirected from Program Cost Estimate)

    0.01 sec.
AcronymDefinition
PCEPersonal Consumption Expenditures
PCEPartido Comunista de Espana (Communist Party of Spain)
PCEPerchloroethylene (CAS Number 127-18-4)
PCEpath computation element
PCEPolymers Center of Excellence
PCEProfessional Continuing Education
PCEParliamentary Commissioner for the Environment (New Zealand)
PCEPollution Control Equipment
PCEPower Conversion Efficiency (electronics)
PCEPyrometric Cone Equivalent
PCEProcess Control Engineering
PCEParents for Choice in Education (Utah)
PCEPersonal Computing Environment
PCEPatrol Escort
PCEProtective Clothing and Equipment
PCEPerchloroethane (aka tetrachloroethane)
PCEPatient Care Evaluation
PCEPrivate Character Editor
PCEProcess Centered Environment
PCEPower Control Error
PCEPre-existing Condition Exclusion (health insurance)
PCEProject Cost Estimate (USACE)
PCEPeak-To-Correlation Energy
PCEPreliminary Cost Estimate
PCEPartial Compliance Evaluation
PCEPower Control Electronics
PCEPower Conditioning Equipment
PCEParametric Cost Estimating
PCEProfessional Competency Examination
PCEPower Conversion Electronics
PCEProgram Cost Estimate
PCEPower Conversion Equipment
PCEPayload Control Electronics
PCEParticulate Control Experiment
PCEPermanent Channel Easement
PCEPotential Compensable Event
PCEPath Characteristics Estimation
PCEPrice to Cash Earnings
PCEPortable Cryptologic Equipment
PCEPara Club Elsenborn (skydiving club)
PCEProcess Communications Engineer
PCEPre-Code Only
PCEProfit-Center Earnings
PCEPLRS Communications Enhancement
PCEPrimary Control Element
PCEPercent Competition Exceeded
PCEPorsche Club of Estonia
PCEPrechambered Explosive
PCEPreliminary Combat Entity
PCEPhase Corrected Equalizer
PCEPresentation Connection Endpoint
PCEPortable Computing Environment
PCEProcessor Controller Element
PCEPattern Class Extension
PCEPackage Collection Editor


How to thank TFD for its existence? Tell a friend about us, add a link to this page, add the site to iGoogle, or visit webmaster's page for free fun content.
?Page tools
Printer friendly
Cite / link
Email
Feedback
? References in periodicals archive
The total program cost estimates provided in the SARs include research and development, procurement, military construction, and acquisition-related operations and maintenance (except for pre-Milestone B programs, which are limited to development costs pursuant to 10 USC [section]2432).
The Defense Department's controller, Dov Zackheim, told industry executives that the current administration plans to crack down on the practice of "lowballing" program cost estimates, which assumes that Congress will provide a supplemental later to cover the shortfalls.
As a result of the national increase in the cost of materials and labor, exacerbated by the hurricane impact on the Gulf Coast region, the TIMED program cost estimate has risen to $4.
 
Acronyms browser? ? Full browser
 
 
Acronyms and Abbreviations
?

Disclaimer | Privacy policy | Feedback | Copyright © 2008 Farlex, Inc.
All content on this website, including dictionary, thesaurus, literature, geography, and other reference data is for informational purposes only. This information should not be considered complete, up to date, and is not intended to be used in place of a visit, consultation, or advice of a legal, medical, or any other professional. Terms of Use.