S-BOM

AcronymDefinition
S-BOMSales/Service Bill-Of-Materials
References in periodicals archive ?
For the SIP-G problem, if there are n parts in the G-BOM, X more parts will exist in the new S-BOM after the BOM is split.
In the S-BOM, p denote the number counted from the left of the immediate parent part, just the same as in the previous paper (e.
5 Long lead time (26 + days) 30% ltp Medium lead time (11 to 25 days) 50% Short lead time (1 to 10 days) 80% Table 4: Parameter values for small instances in the S-BOM after splitting.