TPBV

AcronymDefinition
TPBVTwo-Point Boundary Value
References in periodicals archive ?
Hierarchical organization of the DMS provides the decision making for problems of optimal planning of SBP at strategic level (SL), the formation and the timely correction of its technological schedule at a tactical level (TL), identification of cargo system elements' damages and adaptive control of the rotary sluice valves by means of parametrical identification of FCS during realization of TPBV at executive level (EL).
the APM and program-technical means (PTM) of DMS tactical level functioning for forming and current correction of technological schedule of the TPBV in conditions of nonstationary external disturbances are developed and tested;