UP1

AcronymDefinition
UP1Unwinding Protein 1
UP1Urine Protein 1
References in periodicals archive ?
UP1 = max [0, (midpoint adjusted--midpoint original)/midpoint original] * 100%, and (1)
As shown by UP1 coefficients, COSOs increase their initial filings by 4.
023 for UP7, UP6, UP5, and UP4 respectively, but the normalized throughput nearly remains unchanged for UP3, UP2, UP1, and UP0 respectively.
After additional experiments, it turned out that UP1 was not a real gene after all.
We did not detect migratory activity through UP1 and UP2 during the first migration period in autumn 2004 when the mitigation activities were not yet complete.
Como resultado final e com a preocupacao de pensar a paisagem da bacia visando problemas com perda de solo (erosao e denudacao) diante de uma futura expansao de uso e cobertura da terra, a sintese se apresenta da seguinte forma: na UP1 o uso antropico apresenta restricao devido a erosao superficial, com potencial de contaminacao do solo; ja na UP2 o uso e considerado restritivo devido a movimentos de massa; no caso da UP3 e UP3 B, o uso foi classificado como muito restritivo devido a movimentos de massa intensos; para a UP4 o uso e restritivo devido a movimentos de massa em grande parte, com excecao para o setor sul, em que o uso foi classificado como muito restritivo devido, principalmente ao empobrecimento do solo.
A producao agricola destina-se basicamente a complementacao da renda e parte da mao-de-obra disponivel e utilizada para realizar pequenos cultivos, aliviando a necessidade de compra de alguns alimentos; (b) a utilizacao da mao-de-obra nas unidades de paisagem UP1 (0,27 EQ/H) e UP2 (0,25 EQ/H) sao proximas, o que representa 2,16 horas e 2 horas trabalhadas por dia nas unidades, respectivamente.
Design and manufacturing of tooling opening release casks to ERCF under the Bitumen packaging waste recovery project (RCD-B) of the UP1 program on the Marcoule site.
com10 TIPS TO HELP YOU CLEAN UP1 Think, think and think - make sure you think everything through properly.
Projects involved in the provision are - Support the project to develop fire the UP1 reprocessing plant studies- Support the project to develop studies of fire Stripping G1/G2/G3 installation,- Support RS / DEM ADM responsible for monitoring fire studies project to achieve,- Support to project safety review EIP responsible for monitoring fire studies to be performed,- Support for the safety assessment of the northern zone project- Consolidation of the study of fire risks in March 400,- Approach diagnosis of BPI and other facilities subject to the Labour Code in relation to the fire issue compliance- Support to project safety review of BNI Atalante, in charge of monitoring studies to revise fire.
This contract concerns the work of deconstruction level 0 unit 226G evaporation located in Building 113 of the installation of the SPF-AVM UP1 CEA program marcoule.
The decommissioning security cell business department of sanitation dismantling projects (DDPA) CEA wishes to hire an outside company achieving deliverables necessary nuclear safety sanitation operations, decommissioning and waste recovery and reconditioning facilities individual program of UP1 and Driver Workshop Marcoule (APM) of the CEA Marcoule site: Farm Duration: 3 years and option: Faculty of contract renewal 1 year 1 year.