BBME

AcronymDefinition
BBMEBritish Bank of the Middle East
BBMEBachelor of Biomedical Engineering
References in periodicals archive ?
One theme runs throughout: the difficulties of operating a foreign-owned bank in a developing country When the BBME entered a country, the rudimentary nature of the economy often limited the bank's business opportunities, As the economy developed, so did business opportunities for the BBME.
The renewal of the base coat in slow lane in the UK or BBME.
The work includes: -A sewerage system of wastewater -a line supply of drinking water to homes and fire hydrants -a sewerage system stormwater -the general earthworks -the structure of pedestrian traffic, cyclists and automobiles -the temporary surface coatings -the civil NICT networks, irrigation and street lighting -a public lighting network -the development of street furniture the main Quantities are: 5 500 m3 earthworks mass 2 300 m3 excavation trench Implementation: 3700 m3 GNT 0 / 20 -700 m3 GNT 0/60 -300 m3 of sand -500 m3 of rice grain -200 m3 GNT 0/80 -700 m3 of lightweight aggregate concrete embankment 2000 T Gb 1300 T BBME - 400 MB of T on sidewalk spaces Mixed supply and installation of: 1100 ml sheath diam.
5) or recycled materials - impregnating and bonding layers,- Supply, transport and implementation of the different layers of pavement,- Base course: 14 EB seat (EME 2 0/14) of 8 cm thick,- Base course: 14 EB seat (EME 2 0/14) of 8 cm thick,- Wearing course: 10 EB bearing (3 BBME 0/10) 6 cm thick)- Signaling and safety equipment.
The supply, transport and implementation of hydrocarbon materials hot (serious bitumen, EME, BBSG, BBME, BBM, BBTM)