C24

AcronymDefinition
C24Concentration at 24 Hours (also seen as C24 h)
References in periodicals archive ?
En effet, l'Algerie a tente d'introduire ces allegations fallacieuses par le biais du rapporteur syrien du C24. Ce dernier a ainsi voulu renvoyer l'ascenseur a l'Algerie, dont le ministre des affaires etrangeres, Abdelkader Messahel, etait bien l'un des tres rares, voire l'unique haut responsable au monde a rendre visite a Damas, en avril 2016, cautionnant les atrocites et violations massives perpetrees en Syrie.
Midlands based hosting provider, C24, has capitalised on its successful start to 2015 with three new client wins in April 2015 alone.
These alterations were achieved by hydroxylation on C12; demethylation on C13, C15, and C31; succination of C24 and C32; and addition of an oxime group on C22.
Field roads C7 and C24 - Doubravany, C14 - Sovenice: VPC 4/20 - one-way two-way, with points of avoidance, total length 1,837 54 km, in the section 0,000 00 to 1,441 39 km, the road will be made as rail, from km 1,441 39, by the end of the journey at 1.837 54 km, the path will be covered with bituminous layers, including the planting of high-trees of fruit trees (17 pcs) and a lively shaped fence.
The increases in Cer, LC, and CTH were greatest in the C24:1 species, and the decreases in GC and SM were greatest in the C22:0 species.
The filter bag produced on the IMA C24 can be wrapped individually in either a crimped outer envelope or a heatsealed outer envelope.
C24 are specialists in the delivery of business critical applications from private 'cloud' infrastructures, all managed from two of the UKs most secure and private data centres.
To exclude depletion of the substrate in the medium, we measured the amount of [D.sub.3] C24:0 present in the medium after 72 h.
extension with cold roof chair sealing / emergency sealing with bituminous membranes on flat slab with lateral ascent; about 960 m 2 mineral walkable insulation pad; about 960 m 2 wooden roof truss with nh c24 nkl 2; .Ca.
T3.1 of the apple t.3 and b3, B6, B7, B8, B9, B14, B15, B16, B17, B18, B19, B20, C11, C12, C13, C14, C15, C16, C23, C24, C26, C27, C28 and c29, Of the j block, In san eloy of the pp highway of palm destined to construction under commercial and industrial ordinance.
190 m 2 facade railway, - about 335 m kvh c24, - about 365 m 2 planking, - build up approx.
Contract notice: Engineering services - A 44 project c24 rlo c241 routeless c241 bol / b