ECD

(redirected from Expected Completion Date)
AcronymDefinition
ECDEducation and Curriculum Development (various locations)
ECDElectron Capture Detector
ECDEconomic and Community Development (various locations)
ECDEl Confidencial Digital (Spanish: The Digital Confidential; newspaper)
ECDEarly Childhood Development
ECDExecutive Creative Director (advertising)
ECDErdheim-Chester Disease (rare disorder)
ECDEducation Childhood Development
ECDEast Coast Dyes (sports equipment; Towson, MD)
ECDElectron Capture Dissociation
ECDElectrochromic Display
ECDEast Coast Demerara (Demerara, Guyana)
ECDEstimated Completion Date
ECDExtended Criteria Donor (organ transplantation)
ECDEndothelial Cell Density
ECDEnergy Citations Database
ECDElectronic Civil Disobedience
ECDEmission Control Device
ECDÉcole du Commerce et de la Distribution (French: School of Commerce and Distribution)
ECDEquipment Configuration Database
ECDElectronic Chart Display
ECDEmbedded Computing Design
ECDEuropean Copyright Directive (EU)
ECDEnglish Country Dance
ECDEmergency Communications Department (various locations)
ECDEmbedded Controls Developer (VisSim)
ECDElectrochemical Deposition
ECDEthyl Cysteinate Dimer
ECDExpected Completion Date
ECDElectro-Chemical Devices, Inc. (Anaheim, CA)
ECDElectronic Communication Device
ECDEquivalent Circuit Diagram
ECDEnvironmentally Conscious Design
ECDEnvironment and Conservation Division (various locations)
ECDElectrochemical Detector
ECDElectronic Commerce Directive (UK)
ECDEnhanced Color Display
ECDEquine Cushing's Disease
ECDEuropean Catering Distributors
ECDEurasian Collared-Dove (bird)
ECDExtraction des Connaissances à Partir des Données (French: Extracting Knowledge from Data)
ECDEquivalent Current Dipole
ECDEnergy Conscious Design (UK)
ECDE-Community Development (Sterling Commerce)
ECDEddy-Current Distribution
ECDEquivalent Circulating Density
ECDEnhanced Compact Disc
ECDEastern Caribbean Dollar
ECDEctrodactyly
ECDEuro Constructions Développement (French: Euro Construction Development)
ECDEntry Control Device
ECDElectronic Check Deposit (Citibank)
ECDElectrochemical Deburring (process to remove burrs from metals)
ECDEnvironmental Carcinogenesis Division (US EPA)
ECDEarth Crust Displacement
ECDElectronic Controls Design, Inc (Milwaukie, Oregon)
ECDEngineering Change Document
ECDEvaluation Criteria Document (IEEE)
ECDExplosive Containment Device
ECDEau Concept Développement (French: Water Concept Development)
ECDEnergy Centre Denmark (est. 1991)
ECDExternal Class Description
ECDÉcole de Conduite Deauvillaise (French driving school)
ECDÉlectricité Climatisation Domotique (French: Power Conditioning Home Automation)
ECDEntretien Chimie Distribution (French: Chemical Distribution Maintenance)
ECDEffective Cumulative Dose
ECDEmergency Contacts Directory (various organizations)
ECDEmission Control Diesel
ECDEspace Clément David (French: David Clement Space)
ECDÉchelle Comportementale pour la Démence (French: Behavioral Scale for Dementia)
ECDEquivalent Circle Diameter (measurement)
ECDEast Coast Destruction (bicycle motocross clothing; Bethlehem, PA)
ECDEastern Canadian District (Canada)
ECDElectron Capture Diameter
ECDEffect Correspondence Diagram
ECDElectrical Critical Dimension
ECDE-Commerce and Development Report (UNCTAD)
ECDError Cluster Distribution
ECDEdelson Clifford D'Angelo (law firm; Ontario, Canada)
ECDEffective Cut-Off Diameter
ECDEmergency Calendar Deleter
ECDElectrochemical Decontamination/Electrodecontamination
ECDEnergy Conversion Devices, Incorporated
ECDExecutive Council on Diversity and Worklife (Ford Motor Company)
ECDErasures Correcting Decoder
ECDEuropean Ceiling Designs, Inc.
ECDElement Control/Configuration Document
ECDEffective Candela
ECDExchange Cabling Data
ECDendocardial cushing defect
ECDEuropean Communications Division
ECDExternal Computerized Device
ECDEuropean Convertible Debenture
ECDEstimated Correction Date
ECDExpect Change Departure to Read
ECDExpected Connection Date
ECDEst Chauffage Dépannage (French: Heating Repairs)
ECDExercise Control Directorate
ECDEnvironmental Considerations Document
ECDExtracranial Doppler Sonography
ECDEarliest Completion Date
ECDTotal Commercial Energy Demand (Carolina Environmental Program)
References in periodicals archive ?
And now the next phase of work, which will include new footpaths, trees and public art, is underway - with an expected completion date at some point in autumn.
With an expected completion date of 2017, this development will comprise 72 luxury apartments, a prominent restaurant and health and fitness facilities within its 271,051ft 2 .
Phase one of HS2 involves a new high-speed line from Euston in London passing through Tory heartlands in the Chilterns to Birmingham, with an expected completion date of 2026.
Swisscom will announce the definitive final results from the bid, which represents a total offer of about CHF475m, on 29 August, along with additional information whether the conditions of the offer are met and expected completion date.
Lucia and will invited tenders to begin renovations shortly with an expected completion date of September 2014.
The expected completion date for ITV Wales' move is June 2014.
1Airport: Al Maktoum International Airport, Dubai Details: New airport city Investments ($m): 50,000 Planned passenger capacity (m): 160 Expected completion date: 2020
The expected completion date was stated as end of 2010.
Unlike the Trakiya Highway (running from Sofia to Burgas via Southern Bulgaria; expected completion date a 2012), the Maritsa Highway (running from the Trakiya Highway to the border with Turkey; expected completion date a 2013) and the recently completed Lyulin Highway (running from Sofia to the Struma Highway), Hemus, along with Struma and Cherno More, has been lagging behind.
Neither the Oil Ministry's media department nor the chairman of Egyptian Natural Gas Co., the state-run manager of the national pipeline system, provided comments when asked for details about the damages and expected completion date for repairs.
As of December, Tower 4 had risen through the 10th floor with an expected completion date of 2013, but needed the bonds to fund the rest.
The expected completion date is now delayed by at least four, but possibly up to nine, years.
Full browser ?