FDIR

AcronymDefinition
FDIRFailure Detection, Isolation and Recovery
FDIRFault Detection, Isolation & Restoration (electric power; various companies)
FDIRFault Detection, Identification and Recovery (sensor based system; aircraft)
FDIRFault Detection, Isolation and Recovery/Reconfiguration
References in periodicals archive ?
Tender issuethe main objective of the activity is to investigate trade-off and design the gnc and fdir algorithms needed to extendthe autonomyof the aerobraking phase for envision and future planetary missions.
The insight gained from MWD Survey FDIR allows for more informed adjustments to be made while steering a horizontal well, ultimately increasing the accuracy of horizontal well placement.
For instance, although FDIR is clearly motivated by the same concerns as MCL--and has the same tripartite structure as the NAG cycle: (FD), (I), (R)--it typically takes an expert-systems or model-based approach to the issue that imposes significant limitations on the types and range of available diagnoses and repairs, often limiting the options to specific solutions known in advance to fix specific problems.
Tenders are invited for FDIR to Rajpipla Garudeshwar Road Km 0/0 to 3/6 (Providing Premix in Ch.0/0 to 2/0,Ch.2/0 to 3/6 - Left Side & Ch.2/0 to 3/6 Right Side) Dist.
Tenders are invited for FDIR to Gengadiya Vajeria Utavadi Road Km 0/0 to 20/2 (Providing Premix in Ch.0/0 to 6/0, Ch.6/0 to 13/0 & Ch.13/0 to 20/2) Dist.
Tenders are invited for FDIR to Nandod Rasela Poicha Road Km 0/0 to 13/750 Dist.
Tenders are invited for FDIR to Nandod Rasela Poicha Road Km 0/0 to 13/750 Dist:Narmada (Providing SDBC Premix In Scattered Length Between Ch.0/0 to 7/0).
Tenders are invited for FDIR to Various roads under R&B Sub division Rajpipla (Providing SDBC Paver Patta in selected length on (1) Rundh approach road Ch 0/000 to 1/000 (2) Torana approach road Ch 0/000 to 1/000 (3) Rajpara Kandroj Nikoli Road Ch 0/000 to 5/200 (4) Jesalpor Shaherav Shondhaliya road Ch 4/500 to 9/500 (5) Lachharas Tankari road Ch 0/000 to 3/825 (6) Lachharas Mangrol road Ch 2/500 to 5/500) Dist.
the leon3 part of the dsp handles the platform interface (typically via redundant spw) and provides overall data flow management fdir and system management functions including fpga re-configuration.Based on the requirements analysis for eo applications application cases shall be selected for the prototyping phase and implemented in a combination of dsp software and fpga firmware.
Tenders are invited for FDIR to structure work at various places for year 2017-18 Package No.