FRA

(redirected from Flood risk assessment)
Also found in: Wikipedia.
AcronymDefinition
FRAFederal Railroad Administration (US DoT)
FRAFrance
FRAFinancial Reporting and Analysis
FRAFramingham (Amtrak station code; Framingham, MA)
FRAFire Risk Assessment (various organizations)
FRAFrater (Latin: brother)
FRAFranklin Road Academy (Nashville, Tennessee)
FRAFundamental Rights Agency (EU)
FRAFörsvarets Radioanstalt (Swedish: Defense Radio Establishment)
FRAForward Rate Agreement
FRAFisheries Research Agency (Japan)
FRAFugitive Recovery Agent
FRAFull Rate Access
FRAForward Rate Agreements
FRAFranconian (linguistics)
FRAFleet Reserve Association
FRAFull Retirement Age (SSA)
FRAFunctional Risk Assessment (product development)
FRAFlood Risk Assessment
FRAFlash Recovery Area (programming)
FRAForest Resources Association (Rockville, MD)
FRAFrequency Response Analysis
FRAFire and Rescue Authorities (UK emergency services)
FRAFerengi Rules of Acquisition (Star Trek)
FRAFiscal Responsibility Act
FRAFamily Relations Act (Canada)
FRAFixed Radio Access
FRAFlight Refuelling Aircraft (Indian Air Force)
FRAFlorida Redevelopment Association
FRAFlorida Restaurant Association (now Florida Restaurant and Lodging Association)
FRAForward Repair Activity
FRAFund for Rural America
FRAFront Range Airport
FRAFirst Responder - Awareness (hazardous materials)
FRAFrente Radical Alfarista (Spanish: Radical Alfarista Front, Ecuador)
FRAFinancial Responsibility Act
FRAForestry Reclamation Approach
FRAFredericksburg Regional Alliance
FRAFederal Register Act
FRAFermi Research Alliance, LLC (Batavia, IL)
FRAMaintaining Financial Records and Preparing Accounts (business education)
FRAFederal Reimbursement Allowance
FRAFrankfurt, Germany - Frankfurt International (Airport Code)
FRAFinal Repair Account
FRAFuture Rockstars of America
FRAFrost Resistance Aura (gaming, World of Warcraft)
FRAFire Resistance Aura (gaming, World of Warcraft)
FRAFalse River Academy (Louisiana)
FRAFlap Retraction Altitude (aviation)
FRAFoundation Repair Association (construction)
FRAFixed Resource Allocation
FRAFaculty Research Associate
FRAForward/Future Rate Agreement
FRAFast Rate Adaptation
FRAFlame Resistant Apparel
FRAFunded Reimbursement Authority
FRAFlorida Rehabilitation Association
FRAFederal Recovery Administration
FRAFlexible Resource Allocation
FRAFederal Radio Act
FRAFolded Reflector Antenna
FRAFuel Rack Actuator
FRAFlexible Retirement Annuity
FRAForeign Registered Agent
FRAFunctional Requirements Allocation
FRAFan, Return Air
FRAForce Reconnaissance Association
FRAFunded-Reimbursable Reimbursement Authority
FRAFleet Research Assist
FRAFuze Removal Adapter
References in periodicals archive ?
The Catchment Flood Risk Assessment and Management Programme is Ireland's largest analysis of the risk.
The entire Keresley eco-suburb requires a detailed flood risk assessment for us to give a reasonable opinion on how much of the site can be developed safely.
Given the storage of nuclear materials mentioned a number of times in the flood risk assessment (believed to be enriched uranium), I suspect the city council should be very concerned about the location of this facility in a vulnerable floodplain.
Cynon Valley Labour MP Ann Clwyd says she has nowbeen assured the agency is to seek a progress report on a flood risk assessment from the consultants and the Assembly Government.
While arguably acceptable for windstorm or earthquake risk analyses, such variances can result in substantial differences between the property's assumed and actual elevation, making reliable flood risk assessment impossible.
With its adoption, on 25 April, of a number of compromise amendments agreed with the EU Council, the European Parliament, sitting in plenary in Strasbourg, paved the way to a speedy final adoption at second reading (co-decision procedure) of the Directive on flood risk assessment and management.
Section 19 (11) of the new Planning Bill, however, says that local authorities 'may' rather than 'must' secure an environmental assessment and does not mention a strategic flood risk assessment at all.
The planners say while an EIA would not be necessary, a detailed Flood Risk Assessment would be needed given SEPA flood maps identify parts of the site as medium to high risk.
Please see the attached informational document in the live opportunity for national flood risk assessment 2 on https://defra.
Front Elevation Perspective Rear Elevation Perspective Demolition of the old Pavilion has now been completed, with the safe removal of all rubbish, and planning permission is in the final stages of consultation with an imminent traffic survey and flood risk assessment coming.
Roscommon-South Leitrim TD Michael Fitzmaurice slammed plans drawn up by Catchment Flood Risk Assessment Management to tackle the issue in Athleague, Co Roscommon.