FLET

(redirected from Flowline End Termination)
AcronymDefinition
FLETForward Line of Enemy Troops
FLETFlowline End Termination (offshore industry)
FLETForeign Literature in English Translation (various universities)
FLETFinland Latvia Estonia Time (time zones)
FLETFinancial Literacy Education Training (UN)
References in periodicals archive ?
The scope of work includes engineering and procurement support services for the 16a GWF-2 corrosion resistant alloy rigid flowline system, flowline end termination structures, inline tee assembly structures, mid connection structure and subsea tie-in spools.
The scope of work includes engineering and procurement support services for the 16 GWF-2 corrosion resistant alloy rigid flowline system, flowline end termination structures, inline tee assembly structures, mid connection structure and subsea tie-in spools.
The scope of work includes engineering and procurement support services for the 16" GWF-2 corrosion resistant alloy rigid flowline system, flowline end termination structures, inline tee assembly structures, mid connection structure and subsea tie-in spools.
Additionally, Technip would also supply subsea equipment including mid-water arch and flowline end termination for the project, that is situated at water depth ranging from 200m to 430m and foster would also involve in the readiness of 51km of umbilicals, five manifolds and seven SSIV subsea structures and associated flying leads.
Inline installation of 14 Flowline End Terminations (FLETs) and 3 Inline Tees (ILTs), Onshore prefabrication and spooling onto heavy lift reels at a HMC designated spooling base in Batam, Indonesia, Offshore loading of full reels with weights up to 3,185mT using DCV Aegirs 4,000 tonnes heavy lift crane.
Technip, as part of the newly won contract, will provide the project management and engineering services, including fabrication and establishment of pipe-in-pipe flowline of about 23km; and design, fabrication and setting up of flowline end terminations.
This contract covers the project management, engineering, fabrication, installation and pre-commissioning of over 48 kilometres of 10.75-inch outer diameter insulated flowlines, steel catenary risers and flowline end terminations.
Technip said that, the contract won from Deep Gulf Energy III LLC includes project management and engineering services; fabrication and installation of around 23 km of pipe-in-pipe flowline; design, fabrication and installation of flowline end terminations; fabrication and installation of jumpers; and pre-commissioning for the flowline.
fabrication and installation of 12" production pipeline and 6" MEG pipeline complete with a 2" piggy backed service line, supply and installation of steel tube umbilical, manufactured at Technip Umbilicals facility in Newcastle, UK, supply and installation of flexible tails from Flexi France, the Group s manufacturing plant in Le Trait, France, fabrication and installation of pipeline end manifold, flowline end terminations, flexible tails and rigid well tie-in spools, as well as the installation of CPI templates and manifolds, rock dumping and pre-commissioning.
The scope of contract also includes supply and installation of flexible tails from Flexi France, the Group s manufacturing plant in Le Trait, France; fabrication and installation of pipeline end manifold, flowline end terminations, flexible tails and rigid well tie-in spools, as well as the installation of company-provided templates and manifolds; rock dumping and pre-commissioning.
The Glenlivet scope of work includes fabrication and installation of a 12-inch production pipeline and a six-inch mono-ethylene glycol pipeline, complete with a two-inch piggy-backed service line; Supply and installation of steel tube umbilicals, produced at Technip's umbilicals facility in Newcastle, UK; Supply and installation of flexible tails from Flexi France, the group's production unit in Le Trait, France; Frabrication and installation of a pipeline end manifold, flowline end terminations, flexible tails and rigid well tie-in spools, along with the installation of templates and manifolds; Rock dumping and pre-commissioning.