GRDB

AcronymDefinition
GRDBGuyana Rice Development Board
GRDBGame Review Database
GRDBGrid Resource DataBase
Copyright 1988-2018 AcronymFinder.com, All rights reserved.
References in periodicals archive ?
GRDB CALCULATION PROCEDURE AND ITS CALCULATION CASE OF ROOFTOP A17.5
Each case is composed by the model scenarios (e.g., E1, G standing for the first EnergyPlus scenario and GRDB respectively) and rooftop name.
From the range of Rel_[Q.sub.s] (i.e, Max-Min), all GRDB cases are below 10.71%, while the EnergyPlus cases can be as high as 19.52%.
As showed above in Figure 4, for each machine, the Rel_[Q.sub.s] standard deviation of GRDB is less than that of EnergyPlus in all no matter what condition the coil is in for all machines except the dry coil condition for A_7.5 and A_17.5.
From the perspective of model sensitivity or robustness, the GRDB method has a big advantage over EnergyPlus because there is no alternative selection input in the generic method other than the manufacturer (e.g., A or B) or the unit types (e.g., 7.5 ton or 25 ton).