GWRA

AcronymDefinition
GWRAGloucestershire Worcestershire Railwayana Auctions (UK; railway memorabilia auction)
References in periodicals archive ?
With Pakistan still relying on a colonial era law the Easements Act of 1882 which only mentions groundwater once in 64 articles (without defining commercial or private use), it is hoped that legislative change will soon follow the establishment of GWRA and work towards controlling its unchecked use.
Guards' whistles, for example, have immense history and are easy to display A Somerset & Dorset Railway example sold for pounds 500 at GWRA which the vendor purchased on an internet auction site for a third the price, representing a steaming profit.
We used methodology adopted at GWRA for long-term monitoring of nutrient development in moose browse species (A.
To control the over utilization of underground water resources, the government is planning to set up GWRA. Similarly the provinces and Higher Education Commission have been asked to add subjects related to water conservation to the curriculum, said Ahmad Kamal.
Preparation of ground water regulatory framework, legislation, pricing, establishing ground water regulatory authority(GWRA) .The issue was also discussed during the National Water Council Meeting but the steering committee will discuss the issue in depth.
Contract notice: operation of an existing groundwater treatment plant (gwra) with all plant components including the associated removal and discharge facilities including maintenance
the subject of the tendering procedure is the supply and operation of a groundwater treatment plant (gwra) for the cleaning of btex, Lhkw in the period july 2018 - december 2022 with the option of extension until 2024.
- operating the pump station bahnsdorf to maintain the water level in the restloch sedlitz (in total about 42 000 tm 3 ), - deduction of the upgraded water for treatment / purification in the gwra rainitza (cleaning / conditioning of the raised waters in total about 67 750 tm 3 ), - treatment / purification of the horibrunnen water from senftenberg in the gwra rainitza (in total approx.
The following partial services are to be provided: construction of 4 groundwater measuring points and 2 safety wells, construction of a plant footprint, laying of pipe and electric lines, technical equipment of wells, construction and operation of a groundwater treatment plant (gwra), throughput approx.
- site set-up, Site clearing, Site preparation for container sites and groundwater treatment plant (gwra), - pre-trip in the area of the rehabilitation area to the ordinate 31.50 m above sea level.
(GWRA) on an existing floor space, planned total throughput: 80-120 m 3 / h, operation of the GWRA including the 3 fountains over a period of up to 10 years (see II.2.7).
Tenders are invited for Production of deep drainage with collection pipeline, pump shaft and gwra