V

(redirected from Gas Flow)
Category filter:
AcronymDefinition
VVisa (credit card)
VVolt
VVerb
VVatican (international automobile identification)
VVelocity or speed
V5 (Roman numeral)
VVideo
VVersion
VWe
VValue
VVegan
VVoice
VVery
VVector
VVirtual
VVision
VVolume
VValley
VSingle Connection (relative to Net access)
VVice
VVacation
VVictoria
VVisitors
VVehicle
VVital
VVictory
VVariable
VVersus
VVerse
VVoltage (physics)
VVictor (aviation letter code)
VVariant
VVenturi
VVerso
VVelocity
VVide (Latin: see)
VVanadium
VVegetarian (food labeling)
VVomiting
VValor (military award medals)
VVentilation
VBritish Columbia (postal code designation, Canada)
VVessels (blood)
VGas Flow
VValine (amino acid)
VVivendi Universal (stock symbol)
VVendetta (comic)
VVeto (as in V-chips on televisions)
VViscount
VVarsity
VVowel
VVecka (Swedish: Week)
VVisual Acuity
VVitreous
VVänsterpartiet (Swedish political party)
VViolini (catalog of Graf zeppelin mail; philately)
VCanadian Vickers (aircaraft mark)
VSector Pattern (US DoD)
VVelocity of Target Drift (US DoD)
VVTOL/STOL (US military aircraft vehicle type designation)
VPeak Hour Flows (peak hour forecast traffic flows)
VSearch and Rescue Unit Ground Speed (US DoD)
VUS DoT tire speed rating (150 mph)
VVanessa Hudgens music album (Disney Channel star)
VV-Band: 40 GHz-75 GHz frequency band
Copyright 1988-2018 AcronymFinder.com, All rights reserved.
References in periodicals archive ?
"A CBM gas flow typically starts out from an initial rate and then steadily increases to reach a commerciality threshold," Tlou said.
United Energy Pakistan Limited (UEPL) made five successful drills, one was in Tando A Yar district of Sindh in September under which it found oil deposit having initial flow of 1056 bpd, second and third were in Tando M Khan district of Sindh in October with 6.3 mmcfd and 9.5 mmcfd gas flow respectively, while fourth and fifth were also occurred in Sindh province in October and December with 9 mmcfd and 31 mmcfd gas flow respectively.
Noting that everything is ready for starting Iran's gas flow to Basra, Araqi said, "One of the things that hindered Iran's gas export to Basra was that Basra's pipeline system to transmit the gas was not ready, but the lines are ready now."
Due to the solid-gas coupling effect of coal-rock mass deformation and pressure relief gas flow are complicated, which involves seepage mechanics, rock mechanics, elastic-plastic mechanics and many other subjects [1-5].
At the unloading stage after the peak of the advanced abutment pressure, the permeability of coal masses increases gradually; in particular, at the late unloading stage, coal masses near the coal wall are destroyed owing to the decrease in horizontal stress, and the permeability of coal masses might increase by 2-3 orders of magnitude, exhibiting pressure relief and permeability increase, so the gas flow rates from boreholes in this range become an order of magnitude greater than those from boreholes in the in situ stress area.
[1] established that the feasible and effective way for improving the gas flow distribution in Xinjiang retort is to modify the gas inlet structure.
In 2013, Yokogawa successfully implemented a solution that made combined use of Modbus communication type DPharp EJX multivariable transmitters and a ProSafe-RS safety instrumented system that was capable of performing gas flow rate calculations.
PNOC-EC was unable to flow gas in commercial volumes from the Mangosteen-1 well due to restricted gas flow.
* Thermal Mass Flow Meter introduces heat into the gas flow stream (usually an insertion probe), and measures how much heat dissipates using one of more temperature sensors.
In the firing zone, the VOC and a few metal particles were removed by the gas flow. When the gas flow was disturbed by the thermal field of the furnace and structure, the metal particles in the discharging gas flow might randomly adhere to the surface of solar cell, causing contamination.