Dining room HGRH was not included in the original bid.
Isolating the dining and kitchen energy was important in cooling months, as HGRH was added to the test site dining room units, but not to the control site dining room units.
Not including dining room HGRH, the HVAC equipment costs for the DOA design were higher.