IRR1

AcronymDefinition
IRR1Interrupt Request Register 1
References in periodicals archive ?
Analysis of variance for ln(TDP+1) data from the irrigation-induced overland flow study, excluding fertiliser timing of 1 day prior to irrigation 2 The factor 'Irr1' distinguishes between the first irrigation (for which no effect of fertiliser type or timing treatments was possible, as fertiliser was only applied between irrigations 1 and 2) and irrigations 2 and 3.
Completely standardized path coefficients of selected models from Table 2 Data Set 1 (1991, 1992, 1993) STR1 STR2 IRR1 IRR2 [down [down [down [down arrow] arrow] arrow] arrow] IRR2 IRR2 DEP2 DEP3 Baseline model .07 .21 ** -.02 .16 ** Occasion factor model .04 .15 ** -.04 .01 LRSCF model .06 .15 * .16 -.04 Data Set 2 (1991, 1993, 1995) STR1 STR3 IRR1 IRR3 [down [down [down [down arrow] arrow] arrow] arrow] IRR1 IRR4 DEP3 DEP4 Baseline model .28 ** .08 .02 .30 ** Occasion factor model .19 ** .15 * -.01 .09 LRSCF model .16 * .20 * -.06 .19 * * p<.05, ** p<.01 (two-tailed).
([sections]) IRR1, IRR2, IRR3 = 90, 270, 400 mm deficit, respectively.
([double dagger]) IRR1, IRR2, 1RR3 = 90, 270, 400 mm deficit, respectively.
TEHRAN (FNA)- A senior official with the Research Institute of Petroleum Industry (RIPI) said the value of RIPI's projects has increased from IRR970b ($32,058,500) in 2013 to over IRR1,800b ($59,490,000) in 2015.