ITAAC

AcronymDefinition
ITAACInspections, Tests, Analyses, And Acceptance Criteria (United States Nuclear Regulatory Commission)
References in periodicals archive ?
whether ITAAC have been met, eliminate mandatory hearings on uncontested
NRC to use informal procedures in determining whether ITAAC have been
Upon completion, the reactor could begin operating after NRC determined that the ITAAC had been met.
The utility must also provide the ITAAC for the eventual NRC approval to operate the plant.
At the end of construction, the NRC verifies that the new plant meets the ITAAC in the COL and the facility is allowed to operate.