LMRS


Also found in: Wikipedia.
AcronymDefinition
LMRSLand Mobile Radio System
LMRSLong-term Mine Reconnaissance System (US Navy)
LMRSLand Mobile Radio Service
LMRSLeeds Model Railway Society (UK)
LMRSLivestock Market Reporting Service
LMRSLaser Magnetic Resonance Spectrometer (physics)
LMRSLocalized Magnetic Resonance Spectroscopy
Copyright 1988-2018 AcronymFinder.com, All rights reserved.
References in periodicals archive ?
Arregui, "High sensitive refractometers based on lossy mode resonances (LMRs) supported by ITO coated D-shaped optical fibers," Optics Express, vol.
The LMRS includes lane-change incentives regarding the route, own speed, and keeping to the right lane.
"Digital LMRs to gain maximum traction during the forecast period"
(66) Hence, both political liberalists and liberal perfectionists seek to legitimize illiberal communities through the imposition of LMRs in the inner-space of the community.
Al comparar la concentracion de los residuos de IOC con los LMRs establecidos por la FAO/WHO [11], se encontro que para endrin se excedieron estos LMRs con mayor frecuencia: nueve muestras de la marca A, ocho de la marca B, cuatro de la marca C y tres de la marca D; seguido de p,p' DDE: cinco muestras de la marca A y una de la marca B.
Z00862 Land mobile LMRs can be found on Commander directs PBO radio (LMR) unit property books to generate a lateral under a variety of transfer (DA Form different LINs (such 3161) in PBUSE, to as FA2026 and sub-LIN FA2026 and R55336), depending on R55336 under LIN when they were Z00862.
Brisbane, Australia, April 7, 2011 - (ABN Newswire) - On a number of occasions Texon Petroleum Limited (ASX:TXN) has advised shareholders and potential investors about oil shows observed in Wilcox sands in several of its Leighton, Mosman, Rockingham, Sutton ("LMRS") area wells.
Lo's modified R/S analysis (LMRS) is used here to test for long memory effects versus short-term memory alternatives (such as ARCH effects or non-normality).
All Land Mobile Radio System (LMRS) operators are encouraged to evaluate their current service area and determine if their system coverage and capabilities may be expanded under the new rules.