MMSCFD

(redirected from Million Standard Cubic Feet per Day)
Also found in: Wikipedia.
AcronymDefinition
MMSCFDMillion Standard Cubic Feet per Day (gas distribution)
References in periodicals archive ?
The plan is to begin production from the two new wells by next year, which will help raise the production of the Atoll field by around 100 million standard cubic feet per day (mscf/d), and start production in the Katameya field at a rate of 60 mscf/d.
The well was drilled down to the depth of 3,200 meters and tested at the rate of 12.7 million standard cubic feet per day gas, 240 barrels per day condensate through choke size 32/64 inch at well-head flowing pressure 2,478 pounds per square inch from Lumshiwal Formation.
First production is expected in the 2021 calendar year and is estimated to increase production by ~16,000 barrels of oil per day and ~80 million standard cubic feet per day gross at its peak.
"The well has tested 9.12 Million Standard Cubic Feet per day gas, 520 Barrels per Day oil through 32/64" choke at wellhead flowing pressure of 840 Pound per square Inch (Psi) from Lower Goru (Basal Sand) Formation," the company said in a press release.
'The well has tested 9.12 Million Standard Cubic Feet per day gas, 520 Barrels per Day oil through 32/64' choke at wellhead flowing pressure of 840 Pound per square Inch (Psi) from Lower Goru (Basal Sand) Formation,' the company said in a press release.
The well has tested 9.12 million standard cubic feet per day (MMSCFD) of gas and 520 barrels per day of oil through choke at wellhead flowing pressure of 840 pounds per square inch (Psi) from Lower Goru (Basal Sand) Formation.
As previously announced earlier in June 2019, the Acordeon 1 exploration well encountered a significant gas accumulation in the Cienaga de Oro (CDO) sandstone reservoir which tested at a final rate of 33 million standard cubic feet per day (MMscfpd).
The project includes a production complex to extract NGL from natural gas and supply it to an ethylene production facility with a capacity of 670 million standard cubic feet per day.
Previously, it had been expected to plateau at between 50 million and 60 million standard cubic feet per day.
The deal will enable production and sales of an additional 250 million standard cubic feet per day (MMscf/day) by 2021, as part of Pearl Petroleum's expansion plans in the Kurdistan Region of Iraq (KRI).
The plant, located 50km north of Abu Dhabi city, will utilse up to 450 million standard cubic feet per day of sales gas.
Leading EPC contractor JGC is building the $355-million Central Gas Plant 3 as part of an expansion at the Bahrain National Gas Expansion Company to treat 350 million standard cubic feet per day (mmscfd) of unprocessed associated gas (AG)