OSRP

AcronymDefinition
OSRPOil Spill Response Plan
OSRPOpen Space and Recreation Plan (various locations)
OSRPOff-site Source Recovery Project (Los Alamos National Laboratory)
OSRPOccupant Safety Research Partnership
OSRPOptical Switching and Routing Protocol (Agilent Technologies)
OSRPOwn Ship Reference Point
References in periodicals archive ?
The court noted that the text of the CWA does not explicitly grant or deny BSEE discretion to consider additional environmental factors, such as the presence of endangered species, in the OSRP approval process.
Thus, BSEE did not need to submit an EIS prior to approving an OSRP.
228) The Coalition claimed that BSEE's approval of the OSRPs violated the Administrative Procedure Act (APA), (229) the Endangered Species Act (ESA), (230) and the National Environmental Policy Act (NEPA).
By allowing carriers to provision, protect and restore services automatically and in real-time, OSRP enables each CoreDirector to read the status of the network, to evaluate the state of the network, and to dynamically select the best path for traffic to travel across the network to its destination.
We are extremely pleased to be working with CIENA to enable our common customers to perform OSRP testing and analysis, said Bill Wood, general manager of Agilents Advanced Networks Division.
OSRP protocols will be included in future releases of the Agilent E5170A Optical Control Plane Analysis software at no additional cost, beginning early in 2001.
This recovery shipment of the one-millionth curie is the latest on the list of major accomplishments the OSRP team has achieved over the years, said DOE/NNSA Deputy Administrator for Defense Nuclear Nonproliferation Anne Harrington.
Since 1999, OSRP s mission to remove excess, unwanted, abandoned or orphaned radioactive sealed sources that pose a potential risk to health, safety, and national security has resulted in the successful recovery of more than 38,000 radioactive sources from more than 1,100 domestic locations.
approves the OSRP in the first instance; (90) BOEM must also consider
the OSRP before approving an Exploration Plan or DPP.
Though the specifics are beyond this piece's aims, (406) more openness in the OSRP process may well be beneficial.
The OSRP must be consistent with the National Contingency Plan (NCP) and Area Contingency Plans prepared by the U.