PSDM

AcronymDefinition
PSDMPre-Stack Depth Migration (seismic processing; oil industry)
PSDMProblem Solving and Decision Making
PSDMPremier Service Delivery Methodology (Microsoft)
PSDMPengembangan Sumber Daya Manusia (Indonesian: Human Resource Development)
PSDMPalm Springs Desert Museum (Palm Springs, CA)
PSDMPower Spectral Density Mask
PSDMPseudospectrum Descent Method
PSDMPersonnel Services Delivery Memorandum (US DoD)
References in periodicals archive ?
Through promotion of the events on LinkedIn and Twitter, Jane got offers of sponsorship which allowed PSDM to have merchandise and promotional materials.
El modelo cuya imagen respondia a los efectos observados en seccion PSTM de la linea se selecciono como insumo inicial de la PSDM aplicada a los registros CDP de la linea.
In the case when wideband signals are used, the PSDM is defined as [14]
Pre-stack time migration (PSTM) results will be available in November 2011, with pre-stack depth migration (PSDM) results available December 2011.
The data was reprocessed in 2008 using the latest technology, including Reverse Time Migration PSDM, significantly enhancing the image of the reservoir beneath the salt.
Schurter (Santa Rosa, CA) introduces its PSDM series for increased efficiency in driving power transistors (IGBT/ MOSFET) in DC-to-DC converters.
* PSDM Drum Mill--Submersible Basket Media Mill Mixers--High Shear/High Viscosity:
The PSDM Drum Mill is capable of processing milling batches from 20 to 55 gallons in a single drum, and is ideal for low viscosity batches up to 20,000 cps.
Velocity and illumination studies from horizon-based PSDM, 67th Annual International Meeting: Society of Exploration Geophysicists, Expanded Abstracts, 1801-1804.
Kepner-Tregoe Inc: www.kepner-tregoe.com Provides a brief overview of the Kepner-Tregoe Problem Solving and Decision Making (PSDM) technique.
The PSDM scale has been previously studied and includes 6 questions framed as "Who should decide?" in response to various clinical vignettes.[11] We used 2 vignettes from the PSDM scale.
CM Jam Kamal was briefed regarding departmental affairs, functional and non-functional water schemes, QESCO dues, dam projects in Gwadar and water projects in next Federal PSDM. Addressing the session CM Jam Kamal said, the provincial government is committed to provide access of clean drinking water to the masses in Balochistan which is for the PHE department needs to enhance their capabilities, Expressing concern of unnecessary use of water by public Jam Kamal said, the PHE department should launch awareness campaigns regarding importance of water and WASA monthly billing.