PV2

AcronymDefinition
PV2Private Second Class (1 stripe)
PV2Poliovirus Type Two
References in periodicals archive ?
Ovarian stage II showed four oocyte substages, including Og, Pv1, Pv2, and Pv3.
Flow in the system is initiated in the purge configuration (with no flow through the ampoule) by opening the pneumatic valve PV2, with PV1 and PV3 being closed (MV1 and MV2 are open for all measurements), setting the MFC to the desired flow rate, and adjusting TV to obtain the desired pressure in the flow cell, as measured on CDG2.
PV2. E-books are a good investment Price Value compared to the price paid 61.28 for them.
The continued expansion of sewage sampling (244 sites in 41 countries) (8) has increased the frequency of detection of WPV, VDPV, and residual PV2 excretion after mOPV2 vaccination during outbreak responses.
In order to calculate the second part (PV2) the algebraic procedure indicated below is required:
Of the corresponding 16 suspensions, twelve (12/16) were amplified but ten (10/16) were successfully sequenced and typed for the PE-VP1-PCR screen and their identities are as follows: E7 (1 strain), E13 (3 strains), E29 (1 strain), EV B77 (1 strain), CV A1 (1 strain), E6 (2 strains), and PV2 (1 strain).
Table 2.1: Partial Shading Condition Analysis MODULE PV1 PV2 PV3 OUTPUT 1 1000 1000 1000 147.7 2 1000 900 900 137.9 3 1000 900 800 112.6 Table 3.1: Parameters Required In Pso S.NO PARAMETERS REQUIRED VALUES 1 number of variables(n) 1 2 population size(m) 3 3 inertia weight(w) 0.3 4 acceleration factor(c1) 1.2 5 acceleration factor(c2) 1.6 Table 4.1: Mppt Results From Pso Algorithm Using Matlab Number of Iteration Best particle Duty cycle Power 1 3 0.7 147.744 2 3 0.7 147.744 3 3 0.7 147.744
(2-tailed) .000 .000 N 372 372 TABLE 5 Internal consistency for perceived value PV1 PV2 Perceived Correlation Coefficient .924 ** .916 ** value Sig.
Frequency of the information Daily Dummy = 1 if the frequency to learn about the equity market is "daily" Occasional Dummy = 1 if the frequency to learn about the equity market is "occasional" When it is necessary Dummy = 1 if the frequency to learn about the equity market is "when it is necessary" Hardly ever Dummy = 1 if the frequency to learn about the equity market is "hardly ever" PV2 Probability that the knowledge level about the equity market is low Pv3 Probability that the knowledge level about the equity market is average PV4 Probability that the knowledge level about the equity market is high Pv5 Probability that the knowledge level about the equity market is very high References
The power devices [Q.sub.1], [Q.sub.2] and the passive elements [L.sub.1], [L.sub.3], [C.sub.2] constitute the SEPIC converter by which the source PV2 is interfaced with the battery.
Depending in the accepted scenario of work performance: according to the plan (formulas PV1, ED1, ES1), according to the SPI trend (formulas PV2, ED2, ES2, ET1, ET2), according to the SCI trend (CPI x SPI) (formulas PV3, ED3, ES3).