POE

(redirected from Post Occupancy Evaluation)
Category filter:
AcronymDefinition
POEPower-Over-Ethernet
POEPath of Exile (gaming)
POEPhase of Education
POEPiece of Eden
POEProof of Employment
POEPoint of Entry
POEPortfolio of Evidence
POEPeace On Earth
POEProof of Execution
POEPoint of Equilibrium
POEProjekt Ostry Emade (Polish: Rough Draft Emade)
POEPropagation of Error (statistical software)
POEProperty of Equality (mathematics)
POEPeriod of Enrollment (financial aid)
POEPorts of Entry
POEPoint of Exit
POEPoint of Existence (game)
POEPublic Outreach and Education (various locations)
POEPortal of Evil (website)
POEPaid Owned Earned Media (marketing)
POEPrecio de Oportunidad de la Energía (Spanish: Price Energy Opportunity)
POEPower over Ethernet
POEPersistent Object Environment
POEPerl over Ethernet
POEProof of Entitlement
POEPlace of Employment
POEProcess of Elimination
POEPanel of Experts
POEPort Of Embarkation
POEPost Occupancy Evaluation (now Facility Performance Evaluation)
POEPerl Object Environment
POEProblem of Evil (theology)
POEPrinciples of Engineering
POEPolyolester (type of oil for A/C)
POEPhysician Order Entry
POEPipe Organ Encounter
POEProvider Outreach and Education Advisory Group (US Medicare)
POEPoint of Embarkation
POEPurity of Essence (Dr. Strangelove)
POEPolyolefin Elastomer (polymer)
POEProofs of Entitlement (IBM)
POEPublicly Owned Enterprise (Kosovo)
POEPiece of Eight (old English currency)
POEParallel Operating Environment (IBM)
POEPoint of Exposure
POEPrimary Operating Environment (Australia)
POEProgram Office Estimate
POEProactive Office Encounter
POEPoint Operating Equipment (railway engineering)
POEProjected Operational Environment
POEPlan of Exploration
POEProbability of Exceedence
POEpoint of ending
POEPost Office Express
POEPilot Operational Equipment (US NASA)
POEPlanet Ouest Evasion (French club)
POEPredict, Observe and Explain (science education)
POEPrivately Owned Enterprise
POEProof of Export
POEPoint of Essence
POEPriority of Effort
POEPosture of Engagement
POEPrecise Orbit Ephemerides
POEProgram of Execution
POEPersonally Owned Equipment (various organizations)
POEprotubérance occipitale externe
POEPay Option Election
POEProjected Operating Employment (Navy Association with ROC)
POEProcess Overall Efficiency (engineering)
POEProfessional Office Enterprises
POEProof of Enabler
POEProposed/Projected Operational Environment
Copyright 1988-2018 AcronymFinder.com, All rights reserved.
References in periodicals archive ?
Post occupancy evaluation of buildings indicates that they can deliver low energy as well as high indoor environmental quality and comfort for its occupants.
Post occupancy evaluation of these areas by the University of Nottingham has revealed the most successful are those with dedicated functions, and that meet the same urban design good practices typically found at ground level.
Given that commercial real estate is a heavy user of energy, and the gap between power demanded and consumed by tenants (as demonstrated by this study), post occupancy evaluation at periodic intervals is the need of the hour."
The first study formed part of an engineering doctorate program between Brunel university and consulting engineers Buro Happold (Pegg 2007), which adopted a case study approach to investigate the role of post occupancy evaluation in the design environment.
Therefore, POE (post occupancy evaluation) is a prominent tool that indicates satisfaction and comfort level needs by the building occupants as lessons learned to identify problems in the indoor environment.
"Post occupancy evaluation is helpful but it is a big job," said Julie Dorfman, the LEED consultant.
There is little to which one can take exception in this work: some metric equivalents would have been useful, for example, and some mention of value management processes and post occupancy evaluation would have been helpful, if only to point to ways in which evolving or completed designs can be reviewed and improvements effected, if not on the current project, then at least on the next.
Willmott Dixon has appreciated this for some time and undertakes a Post Occupancy Evaluation (POE) on all projects, 18-24 months after completion.
This publication presents case studies of school buildings to demonstrate the application of a post occupancy evaluation (POE) during various stages of the design and planning process.