The WANTO grant will support RWSA's efforts to help 110 women enter pre-apprenticeship and/or registered apprenticeship programs and introduce 700 women to the benefits of apprenticeships and nontraditional occupations.
Major organization : RIVANNA WATER & SEWER AUTHORITY (RWSA)
strong statements from citizen advocates that they believed a turn-key approach would be less costly than approaches recommended by RWSA consultants, the PPEA process dictated that the private entity that enters into a agreement with RWSA would be responsible for determining an approach to dredging the Reservoir, obtaining all necessary federal, state, and local permits and approvals, negotiations and agreements with private landowners or other entities, and conducting the project in compliance with all applicable federal, State and local laws and egulations.
Description : Included in the RWSA Stage 2 Disinfectants and Disinfection Byproducts Rule Compliance Plan were recommendations for the installation of automatic flushing assemblies throughout the ACSA water system.
It is be constructed in conjunction with the Ivy Road Flordon Water Connection to provide water to the West Leigh Area for domestic and fire protection uses in the event of a major break on the RWSA Stillhouse Mountain water transmission main.
It is to be constructed in conjunction with the Ednam Pump Station Upgrade to provide water to the West Leigh Area for domestic and fire protection uses in the event of a major break on the RWSA Stillhouse Mountain water transmission main.
In the early 1990 s Stage 1 of the rule was implemented and RWSA, ACSA and the City of Charlottesville are in compliance with Stage 1.
RWSA does not plan to proceed with the right-of-way corridor study until VDOT confirms if it will build the Western Bypass Project, as the preferred corridor will depend upon whether or not this road is built.
Description : As a condition of the existing Joint Permit to construct the New Ragged Mountain Dam water supply facility, RWSA is mitigating the environmental impacts to streams and