RRP

(redirected from Rokkasho Reprocessing Plant)
Also found in: Wikipedia.
Category filter:
AcronymDefinition
RRPRenovation, Repair and Painting (US EPA certification)
RRPRecommended Retail Price
RRPRefugee Resettlement Program (various locations)
RRPRoasted Red Pepper (culinary shorthand)
RRPRegulatory Review Period (various organizations)
RRPResidential Rehabilitation Program (various organizations)
RRPRecovery and Rehabilitation Programme (UN Development Programme)
RRPRegistry Registrar Protocol (Network Solutions, Inc)
RRPRegistry Registrar Protocol
RRPRegional Resource Panel
RRPResource Reservation Protocol
RRPRapid Response Process
RRPRouter Redundancy Protocol
RRPRandom Reservation Protocol
RRPRole Resolution Protocol
RRPReservation Request Periods
RRPResilient Ring Protocol
RRPRecurrent Respiratory Papillomatosis
RRPRadical Retropubic Prostatectomy
RRPRelease Retail Price (sales)
RRPRetail Ready Packaging
RRPReadily Releasable Pool
RRPRobinson Ransbottom Pottery (Roseville, OH)
RRPRembrandt Research Project
RRPRisk Reduction Program
RRPRapid Response Program (various organizations)
RRPRiparian Restoration Proposal (Washington)
RRPRegistered Rehabilitation Professional (Canadian Association of Rehabilitation Professionals Inc)
RRPRegistered Resort Professional
RRPRokkasho Reprocessing Plant (Japan)
RRPRecurrent Respiratory Papillomas
RRPRelative Refractory Period
RRPRegional Response Plan (DHS reference for Homeland Security Plan)
RRPRengo Riverwood Packaging (Japan)
RRPReport and Recommendation of the President to the Board of Directors (Asian Development Bank)
RRPRecreation Research Program (US Army)
RRPRelief, Return and Reintegration (UN)
RRPRapid Refuel Point (military aviation)
RRPRunway Reference Point
RRPReentry Rally Point
RRPRemote Registry Protocol
RRPRapid Reinforcement Plan
RRPRadio Reconnaissance Platoon (US Marine Corps)
RRPRemote Radar Post (air defense system)
RRPRequired Retail Price
RRPReturn Reintegration and Protection (UN MIssion in South Sudan)
RRPRadar Range Profile
RRPRadar Receiver Processor
RRPRod-Restack Process
RRPResidue Reduction Program
RRPReverse Range Pressure
RRPRadio Relay Points
RRPRecovery and Resolution Plan (finance)
RRPRequired Risk Premium
RRPRightful Radical Party (political party)
RRPRegional Research Plan (Canada)
RRPRhizosphere Research Products
Copyright 1988-2018 AcronymFinder.com, All rights reserved.
References in periodicals archive ?
For example, international safeguards for the Rokkasho Reprocessing Plant in Japan required the International Atomic Energy Agency (IAEA) to build an on-site laboratory.
It further notes that once the Rokkasho reprocessing plant in Japan under construction starts its operation, the country could obtain the ability of producing eight tonnes of separated plutonium annually.
The Rokkasho reprocessing plant has not yet started full-scale operation amid repeated problems, despite nearly 20 years having passed since the beginning of its construction.
The Japanese government is going ahead with full-capacity operations of the Rokkasho Reprocessing Plant in Aomori Prefecture.
While reconsidering the future of nuclear power, Japan should not forget the troubled 2 trillion yen Rokkasho Reprocessing Plant in Aomori Prefecture.
About 150 liters of highly radioactive waste liquid leaked from piping at the Rokkasho reprocessing plant in January.
The Rokkasho reprocessing plant, which has been on a test run since late March, is Japan's first commercial-basis reprocessing plant and is much bigger in scale than a pilot plant built in another nuclear complex in Tokaimura, Ibaraki Prefecture in eastern Japan.
The International Atomic Energy Agency will station nuclear inspectors at the Rokkasho reprocessing plant because the plutonium to be extracted is fissile and can be used for nuclear weapons.
One reason the Federation of Electric Power Companies published its estimate is that the Rokkasho reprocessing plant is nearing completion, at a projected cost of 2.1 trillion yen.
The storage facilities, which the government claims are indispensable for Japan's nuclear fuel-cycle program, are also said to be necessary because the volume of spent fuel from nuclear plants nationwide will exceed the capacity at the Rokkasho reprocessing plant, now under construction, also in Aomori Prefecture.
Hiroki Okano, president of Oye Kogyo, held a press conference at the company's main plant in Hiratsuka, Kanagawa Prefecture on Thursday and apologized to the stockholders and to the people in Aomori for the mishap at the Rokkasho reprocessing plant.
The officials, concerned that similar discrepancies could occur at the Rokkasho reprocessing plant under construction in Aomori Prefecture, said they are having discussions with the IAEA to improve the measuring equipment and evaluating methods of plutonium.