TP5

AcronymDefinition
TP5Pentapeptide Thymopentin
References in periodicals archive ?
The tunnel temperature was closely controlled and monitored using an Air Products TP5 control module.
Provenience Non- Bones with Shaft Split bone fractured one end fragments fragments bones intact without ends TP5 12 53 39 25 TP6 18 59 47 41 TP10 16 60 36 15 TP11 35 112 54 35 Totals 81 284 176 141 Table 6.
Testpits TP1, TP5 and TP9 were 1x1 m and Areas A and B 2x2 m.
In TP5, the samples comprised a brown soil with coral cobbles, pieces of tephra aggregate and a patchy orange brown/pale brown soil.
Contracts awarded : N02, EP Achereggtunnel and Lopperviadukt / PV and BL construction for the MP (SIA subphase 32) and the subsequent SIA subphases 41, 51, 52 and 53 for inspection and repair of TP5 KuBa / galleries and TP6 Road / Environment / drainage / noise
Tenders are invited for performance design and construction catenary system Tram Bern region, TP 4 + 5 Bern - Ostermundigen, as well as the interface renovation projects trackage Breitenrain and siding Pulverweg with the following dates: Creation of project execution: TP4: November 2014 (signing of contract) by May 2015, TP5: November 2014 (signing of contract) until the end of 2017 at the latest, execution of the works, depending on the progress of construction: 2015-2019 TP4, TP5 2016-2019
Contract awarded for N02, EP Acheregg tunnel and viaducts Lopper / PV and BL Bau for MP (sub-phase 32 SIA) SIA and sub-phases 41, 51, 52 and 53 following for verification and repair KuBa TP5 / TP6 galleries and route / environment / drainage / ear protection
Contract awarded for N02, EP Achereggtunnel and Lopperviadukt / PV and BL construction for the MP (SIA part of phase 32) and the subsequent SIA partial phases 41, 51, 52 and 53 for inspection and repair of the TP5 KuBa / galleries and TP6 Road / Environment / drainage / noise
For the prescribed work TP5 and TP6 engineering structures and galleries Road / Environment / drainage / noise protection measures, there is a concept.