TPCL

AcronymDefinition
TPCLTata Power Company, Ltd. (India)
TPCLTEC Printer Command Language (Toshiba)
TPCLThe Power Company Limited (New Zealand)
TPCLTransparent Power Cord Lanyard
TPCLTissue Procurement Core Laboratory (University of California, Los Angeles)
TPCLTotal Perfused Capillary Length
References in periodicals archive ?
In the latter role, ADB helped establish TPCL, select Turkmengaz as consortium leader, and finalize the Shareholders and Investment Agreements.
Stock solutions of 30% siloxane library in EEP and 90% TPCL in MAK were prepared.
Stock solutions of the PDMS libraries, TPCL, and the catalyst DBTDAc were prepared in order to dispense the materials more accurately and easily.
The TPCL survey was administered twice during Phase One.
The TPCL survey and the UTA 1 survey were administered in October at the end of the student teachers' first student teaching placement and the TPCL survey and UTA 2 survey were administered in December at the end of the student teachers' second student teaching placement.
The TPCL survey was administered when the preservice teachers began their method courses in the spring semester.
Acting as the transaction advisor, the regional lender has facilitated in the formation of TPCL, as well as Turkmengazs selection as the head of the consortium, and settlement of the Shareholders and Investment Agreements.
While, Minister for Petroleum and Natural Resources Shahid Khaqan Abbasi said Turkmenistan-Afghanistan-Pakistan-India (TAPI) Parties had been appointed as the Consortium Leader which will take 85 per cent of the equity while remaining parties have committed to take 5 per cent equity shares in the TPCL.
TPCL will build, own, and operate the TAPI pipeline, which once completed, will transport up to 33 billion cubic meters of natural gas annually from Turkmenistan to the three other countries for the next 30 years.
Opening a new window, the core company of the Teijin Group s carbon fibers and composites business, announced today that TENAX TPCL, its thermoplastic consolidated laminates have been qualified for use in the A350 XWB Opening a new window aircraft, Airbus s new-generation extra-wide-body midsize jetliner.
Signing of the contract agreement was held at Ceylon Electricity Board (CEB) head office in Colombo and was signed by Shri Atul Srivastava, MD & Shri MC Wickramasekara, Director, TPCL, and Shri P.
NTPC, which has 42964-MW of installed capacity now, has inked the contract with TPCL on 13th of this month in the Sri Lankan capital city of Colombo.