TUAS


Also found in: Dictionary, Wikipedia.
AcronymDefinition
TUASTactical Unmanned Aircraft System (US DoD)
TUASTurku University of Applied Sciences (Finland)
TUASThai University Administrators Shadowing
References in periodicals archive ?
Tuas WRP is to be located in the west of Singapore and will have the capacity to treat an average dry weather flow of 650 Mega-litres/day of domestic and 150 MLD of non-domestic used water collected in distinct deep tunnels and conveyed by gravity to the mega treatment facility.
The Army's tactical intelligence collection mission requires a longer-enduring TUAS and one that is more deployable than the Shadow.
Under this EUR51.0m award, the four Shadow TUAS purchased by Italy, will be deployed alongside NATO forces.
This has involved moving a number of its operations into a 10,000 square metre factory at 36 Tuas Crescent, across the road from the main yard, and linking the factory to the shipyard by a pedestrian bridge.
Up to date, AAI has reportedly contracted for a total of 113 Shadow TUAS and delivered a total of 71.
Both the Tuas and Woodlands plants were opened in 1996, with the Tuas plant belonging to Conner Peripherals which was acquired by Seagate shortly after the plant opened.
??"The pumping stations are the focal point that link the DTSS Phase 2 tunnels with the Tuas WRP.
Malaysia yesterday proposed that from midnight today, Singapore and Malaysia 'cease and desist' from sending assets into the disputed area off Tuas, which is affected by the alteration of Johor Baru's port limits.
Years of mission readiness exercises (MREs) have accustomed commanders to secure base operations for TUAS. FSO, at least in part, strips away much of that security blanket.
International Resource News-October 21, 2010--Alstom SA receives contract from Tuas Power Generation Pte Ltd(C)1994-2010 ENPublishing - http://www.enpublishing.co.uk
Work on the newbuildings and conversions will be undertaken at DDW-SEA's Batam yards -- Graha, Pertama and Nanindah and at its Singapore yard at Tuas. Work on the newbuildings and conversions will start later this year and they are all due for delivery in 2011-2012.