426

(redirected from Upgrade Required)
AcronymDefinition
426Upgrade Required (HTTP status code)
References in periodicals archive ?
The upgrade required the line to be down for three weeks in May, which resulted in higher costs and lower value-added shipments, reducing potential pretax earnings by an estimated USD15m during the period.
The report adds: "The current configuration is also expensive, with backlog maintenance and upgrade required for time expired buildings at the HRI site amounting to PS92m and the PFI at the CRH site amounting to an annual revenue cost in excess of PS20m.
It is a suggestion that will give the technology providers of DRS technology some solace, as the technology upgrade required to become part of the game's rule book is far more expensive and sophisticated than the original aim with which the technology was provided to cricket broadcasters: to merely be part of the television-watching experience.
"The cost effectiveness of a retrofit depends on the amount of upgrade required," Antonini said.
The real estate official said their existing security system "meets the police specifications." The additional cameras will give them a better view of more common areas and is part of a security upgrade required by authorities, he added.
The upgrade required that the facility be closed for three weeks, according to Mayton.
With just eight months to go before Donington is due to stage the race, time is running out on Gillett to carry out the multi-million pound upgrade required to turn the venue into a Formula One circuit.
With just eight months to go before Donington is due to stage the race, time is fast running out on Gillett to carry out the multi-million pound upgrade required to turn the venue into a F1-ready circuit.
Huawei's solution is based on IP technology which unifies 2G/3G networks and enables the connection between the core network and the access layer to be completely IP, with no replacement hardware or software upgrade required for a migration from 2G to 3G.
By the spring, they had already upgraded all six of their node center switches, their 26 small extension nodes and their large extension node because of the new fiber-optic capability, the QMUX upgrade required training equivalent to the level a unit would receive after new equipment fielding.
"Because the upgrade required no excavation, we were able to do the installation in the dead of winter," said Hughes.