VD4

AcronymDefinition
VD4Visceral Dorsal 4
References in periodicals archive ?
Los resultados de la prueba t de Student (tabla 6) apuntan hacia la existencia de una significatividad estadistica en las diferencias entre los dos modelos pedagogicos comparados, en las dimensiones: "Aprovechamiento de clase" (VD1), "Motivacion" (VD3), "Ubicuidad" (VD4) y "Satisfaccion" (VD6).
Grupo Turno N n Modelo tradicional A Manana 130 130 Modelo de clase invertida B Tarde 132 132 Fuente: elaboracion propia Tabla 3 Estructura del cuestionario Area de interes VD Asociada Items Alfa de Cronbach Aprovechamiento de clase VD1 1-4 0,92 Participacion VD2 5-8 0,89 Motivacion VD3 9-12 0,83 Rendimiento VD4 13-16 0,78 Ubicuidad VD5 17-20 0,87 Satisfaccion VD6 20-24 0,80 Fuente: elaboracion propia Tabla 4 Puntuaciones medias y desviaciones tipicas (DT) agrupadas por item y modelo pedagogico Aprovechamiento de clase 1 El modelo pedagogico que durante las clases realice un empleado en este aprendizaje de calidad 2 nucleo ha que disponga de tiempo para plantear dudas contribuido a ...
We consider the work of one PAF when alternately switched transistor VT1 and diode VD4. According to Fig.
At time intervals [t.sub.4] and [t.sub.6] along with transistors VT3, VT2 involved diode VD4 (Fig.
Possible states of the PAF circuit at transistor VT1 and diode VD4 operation
Tenders are invited for Supply retrofitting testing and commissioning of vaccum circuit breaker 12kv (make:calor emag vd4 1206 p250 in existing abb 250kw sw transmitter power supply circuit.
Tenders are invited for Supply retrofitting testing and commissioning of vaccum circuit breaker 12kv ( make: calor emag vd4 1206 p250 in existing abb 250 kw sw transmitter power supply circuit.
Contract notice: C4557C0470 - Visual Experiments of VD4 900 Power Electronics Converters.
In order to operate the units of the NPEs of the French fleet over a period of more than 40 years (VD4 900 MW), inverters / rectifiers must be studied and tested to maintain the so-called "sensitive" components These electrical equipment.
Contract notice: Upgrading hard digital simulators and the impacts of changes on wafer vd4.
As part of the 900 VD4 and VD2 N4, two types of interventions are considered (each includes studies, supplies, manufacturing, transportation, removal of the existing and on-site assembly) - Replacement of windows in buildings personal SAS reactors bearings CP0, CPY and N4 (see details in paragraphs II.2.1 and II.2.2).
As part of the 900 VD4 and VD2 N4 type 2 interventions are planned (each includes studies, supplies, manufacturing, transportation, removal of existing and installation on site) - Replacement of windows in buildings personal SAS bearings CP0 reactors, CPY and N4.