VEXP

AcronymDefinition
VEXPvia Enhanced Xine Player
VEXPVelocity Express Corporation
VEXPVIA Enhanced Xine Player (computer program)
Copyright 1988-2018 AcronymFinder.com, All rights reserved.
References in periodicals archive ?
Proposed prediction model of software development effort estimation has been used to predict software development effort by using sixteen independent parameters such as rely, data, cplx, time, stor, virt, turn, acap, aexp, pcab, vexp, lexp, modp, tool, seed, and kloc.
These sixteen attributes of project such as rely, data, cplx, time, stor, virt, turn, acap, aexp, pcab, vexp, lexp, modp, tool, seed, and kloc are correlated with the development effort.
MNPW = f(MLOS, VLOS, MEXP, VEXP, PS, SIZE, RE, LIQ, ORG),
VEXP the change in variance of growth rates of expenses between 1980 and 1983 and 1983 and 1986
Cost Very low Low Nominal High Very high Extra high drivers acap 1.46 1.19 1 0.86 0.71 pcap 1.42 1.17 1 0.86 0.7 aexp 1.29 1.13 1 0.91 0.82 modp 1.24 1.1 1 0.91 0.82 tool 1.24 1.1 1 0.91 0.83 vexp 1.21 1.1 1 0.9 lexp 1.14 1.07 1 0.95 sced 1.23 1.08 1 1.04 1.1 stor 1 1.06 1.21 1.56 data 0.94 1 1.08 1.16 time 1 1.11 1.3 1.66 turn 0.87 1 1.07 1.15 virt 0.87 1 1.15 1.3 cplx 0.7 0.85 1 1.15 1.3 1.65 rely 0.75 0.88 1 1.15 1.4 Table 2: Significant occurrences of cost drivers.