WDDM


Also found in: Encyclopedia.
AcronymDefinition
WDDMWindows Display Driver Model
WDDMWest Delta Deep Marine (Egypt)
WDDMWindows Vista Display Driver Model (Microsoft)
WDDMWavelength-Division Demultiplexing
WDDMWorldwide Direct Democracy Movement
References in periodicals archive ?
Phase VII of WDDM, which includes a new pipeline and an onshore facility costing around $1 billion, is currently underway and the exploration of the North Gamasa offshore concession was sanctioned earlier this year.
Pre-stack seismic inversion testing was applied on a natural gas brownfield in Egypt's offshore in the West Delta Deep Marine (WDDM) concession.
This features the West Delta Deep Marine (WDDM) block in Egyptian economic waters, where BGI is the operator, adjacent to and north of its Rosetta block.
Our offshore portfolio includes two operated gas-producing concessions--Rosetta and West Delta Deep Marine (WDDM)--and two operated non-producing concessions--North Gamasa NGO and El Burg Offshore EBO.
Egypt West Delta Deep Marine (WDDM) Project Panorama, GlobalData's latest release, presents a comprehensive overview of the asset.
Project management company Technip (Paris:TEC) (ISIN:FR0000131708) announced on Wednesday the receipt of an engineering, procurement, installation and construction (EPIC) contract for the West Delta Deep Marine (WDDM) Phase VIIIa development project, located offshore Egypt in the Mediterranean Sea.
AMD's Catalyst 9.3 software represents the industry's first unified driver installation package to incorporate Windows 7 support, including Windows Display Driver Model (WDDM) 1.1 compliance.
Building on the success of its contributions to the BG-operated Scarab Saffron project in the West Delta Deep Marine (WDDM) concession, INTEC Engineering is providing professional services for the BG-operated Simian Sienna and Sapphire deepwater projects for continued development of the concession offshore Egypt.
However, Zohr is not the only gas field in Egypt; West Nile Delta (WND), Greater Nooros Area, Atoll Phase 1, and WDDM -- Burullus Phase 9B are all important gas fields that add to the national gas production.
The ministry said its plans will add 6bcf/d during the next five years through North Alez, Salamat, Atol, WDDM 9b, and Zohr projects.